A bathroom retile is one of the least forgiving jobs in the house to get wrong -- poor waterproofing or a rushed tile job doesn't just look bad, it can mean damp, lifting tiles, or worse within a couple of years.
If you're planning a full bathroom retile, a shower or wet-room refresh, or just a section of wall behind a new suite, Tilers Dublin will match you with a contractor from our network who has genuine bathroom-tiling experience -- not a general handyman taking on a job outside their depth.
Waterproofing and prep. Before tiling, wet areas (especially shower enclosures and around baths) need a proper waterproof membrane or tanking system underneath the tile, not just a bead of silicone at the edges.
Removal of old tile, if needed. Where a bathroom is being fully retiled, your contractor will assess whether the old tile needs to come off, and factor removal and disposal into your quote.
Levelling and surface prep. Older Dublin properties in particular often have out-of-true walls and floors -- your contractor will level and prep the surface so the finished tiling sits flat and square.
Tile cutting around fittings. Toilets, sinks, baths, and shower trays all need precise cuts around pipework and fixtures.

Ceramic, porcelain, and natural stone all suit bathrooms differently. Ceramic is the most budget-friendly option and works well on walls; porcelain is denser and more water-resistant, making it a common choice for shower floors and wet-room flooring. Natural stone gives a premium finish but generally needs additional sealing to handle constant moisture. Your matched contractor can talk through which suits your bathroom, your budget, and how much maintenance you're willing to take on.
| Bathroom Type | Typical Range |
|---|---|
| Small bathroom / ensuite retile | €700 – €1,600 |
| Full bathroom (walls and floor) | €800 – €1,200+ |
| Per m², standard ceramic | €25 – €35 |
| Per m², large-format or premium tile | €45 – €120 |
These are general market ranges, not a quote -- get a free quote for pricing specific to your bathroom.

Matched to a contractor with real bathroom-tiling experience, not a general tradesperson.
Not treated as an afterthought behind the tile.
Before any work is agreed.
You deal directly with the contractor matched to your job, not an anonymous crew or a call centre.
No obligation, and no pressure to commit until you're ready.
No -- your matched contractor will handle removal as part of the job if it's needed, and it'll be included in your quote.
Most full bathroom retiles run from a few days to just over a week including prep, waterproofing, tiling, and grouting.